Projects

  • Photo credit: Hugh Loomis, Architectural and Industrial Photography and Domus, Inc.
  • Photo credit: Hugh Loomis, Architectural and Industrial Photography and Domus, Inc.
  • Photo credit: Hugh Loomis, Architectural and Industrial Photography and Domus, Inc.
  • Photo credit: Hugh Loomis, Architectural and Industrial Photography and Domus, Inc.

Historical

Village of St. John

2020 Tatnall Street
Wilmington, DE 19802

Sqft: 68,280
Cost: 12,500,000


Renovation of an existing historic church cathedral and original Dean’s house into (17) apartments and a new addition with (36) apartments of affordable housing.  Spaces include living units, community building, computer room, exercise room, offices, and laundry room.  Engineering services include mechanical, plumbing, electrical, and fire protection system specifically kitchen hood exhaust/make-up air gas fired systems, ductless split systems, split system heat pump, perimeter electric heaters, exhaust air systems, domestic water heating system, gas piping distribution system, domestic water distribution system, solar thermal centralized domestic hot water system, lighting, lighting controls, exit/emergency lighting, diesel/gas fired emergency/stand-by generator, power distribution system, addressable fire alarm system, low voltage systems power, fire protection system (performance specification), standpipes. Engineering Design for Energy Star and Delaware Housing Authority.