New Construction of a 3-story health science building and layout of campus plant utilities. Spaces Include nutrition, CPR, multi-purpose room, wellness center, coding, classroom, reception, collaboration lobby, group fitness, classrooms, CPE skills, phlebotomy, faculty offices, conference room, overlook, dean’s suite, nursing facility offices, nursing skills, debriefing room, simulation rooms, lounge, testing room, breakroom, and support spaces. Engineering services include mechanical, plumbing, electrical, and fire protection system specifically energy recovery system, daylight harvesting, classroom lighting controls, lighting control panel, underground central plant hot and chilled water piping, central station VAV air handlers, VAV boxes with hot water reheat, building management system, lab compressed air system, nursing headwall systems, high voltage power from campus CHP plant, medical gas infrastructure, domestic water heating system, domestic water system, sewage ejection system. Lighting, lighting controls, exit/emergency lighting, power distribution system, addressable fire alarm system, low voltage systems power, fire protection system (performance specification).